Check Lumo planned departure and arrival times currently available to book.

more reliable and greener services
The introduction of digital signalling onto the East Coast Main Line will see traditional lineside signals removed and upgraded with European Train Control System (ETCS) technology. This will provide continuous, real-time information to the train driver’s cab, resulting in more reliable and greener services for all passengers.
For more information, please visit https://eastcoastdigitalprogramme.co.uk/
planned engineering works
Upgrade of the signalling system is a significant task, and this means that there will be some periods of disruption to passengers whilst this work takes place. Engineering works to improve the rail network will usually take place overnight and at weekends with alternative transport provided where possible.
For more details, visit our planned engineering works page.

plan before you travel

